GUIDE

How does ordering a sign work, and what should you watch for?

Ordering a sign step by step, from survey to installation. Measurements, the municipal permit and advertising tax, installation day and the usual mistakes.

Written by Erdem G. · İZVELA

Ordering a sign is less like buying a product and more like making a facade readable. Measurement, material, lighting, permit and installation depend on each other, and when one is missing the result shows on the facade. This guide walks through the process from the point of view of a business owner who has never ordered a sign before. Which type of sign works where is the subject of a separate guide. Here we look at how the job runs regardless of type.

Where does ordering a sign start?

The starting point is the facade, not the sign maker. The step that saves the most time is a few photographs of the facade taken from the front and from both sides. They show the surface the sign will sit on, the canopy, the shutter, the air conditioning unit and the neighbouring signs. Each of these affects the size and the mounting method.

The second step is the logo file. Every job that goes to print or to cutting needs a vector file. If all you have is a small image saved from social media, the edges fall apart once the letters are enlarged. If there is no file, the logo has to be redrawn first, and that is planned before the sign.

The third step is deciding what the sign will say. Will the name stand alone, will the line of business go underneath, will a phone number go on the facade. When these change later the sign is designed again, so settling them in the first conversation shortens the job.

How are the measurements taken, and what fits the facade?

Measurements are not guessed from a photograph, they are taken on site. The width of the facade, the height of the band the sign will sit in and the type of surface (render, composite cladding, glass or metal) are measured. The same survey settles where the power line will come from, because the cable of a lit sign is planned from the start so it does not end up hanging on the facade.

Letter height follows reading distance. On a shop facade letters between 30 and 60 centimetres are enough in most cases, and interior wayfinding uses 15 to 30 centimetres. A pylon sign read from a car at the roadside usually rises to 3 to 6 metres inside the city. These ranges are a frame for starting the measurement, the final figure is settled on the facade.

Neighbouring signs are part of the measurement too. When two signs side by side sit at the same height in the same band, the street reads tidily. When one is higher and the other lower, the eye sees the disorder first. The survey notes the top and bottom levels of the neighbouring signs.

Which decisions are made at the design stage?

The design stage is a decision about colour, background and light. The first question is whether the logo colours can stay as they are on the sign. If they clash with the facade colour, a background is added behind the letters. Light letters on a dark facade and dark or coloured letters on a light facade read from further away.

The lighting decision is part of the design, not an option added afterwards. Will the light come from inside the letter, will it wash the wall from behind, or will the sign stay unlit. Each gives a different night view, and if the business is open in the evening the night view brings more customers than the day view.

Design approval is given on a visual placed over the photograph of the facade. A design floating on a blank background does not show how it will sit on the facade. Approval is given on that visual, and production starts only after it.

How do the municipal permit and the advertising tax work?

Every sign hung on a facade falls under the municipality’s rules for advertising. There are two separate matters and they are often confused. The first is the set of rules about the size, position and lighting of the sign. These are written in the advertising regulations of the district and metropolitan municipalities. The second is the advertising tax. It starts with a declaration the business files with the municipality under the Municipal Revenues Law.

The tax is calculated on the square metres of the sign, and lit and unlit signs fall under different tariffs. The tariff changes from one municipality to another, so the amount is stated by the municipality, not by the sign maker. The declaration is filed in the name of the business and the duty for the sign rests with the business. Skipping this step comes back later as a penalised assessment.

In some places another approval is needed beyond the municipality. In a shopping centre, an office building or a housing estate the management plan can limit the size and the form of the sign. The survey asks about this, because producing a sign the management will not accept wastes time on both sides.

What happens on production and installation day?

Production time depends on the material. A flat vinyl lettering job is ready in a few days, while internally lit channel letters take longer, because every letter is cut, bent and fitted with its lighting one by one. That is why the time given at the survey depends on the type, there is no single general figure.

Installation day means working at height on the facade. Whether a scaffold or a platform is needed is settled at the survey. The electrical connection is made on the same day as the installation and the cable is hidden inside the facade or in a conduit. If there is a shutter, the sign is checked once more before mounting to make sure it does not clash with the shutter box.

When the installation is finished the sign is handed over after being seen in daylight and, where possible, at night. The night check shows whether the light spreads evenly. One letter glowing dimmer than the rest only shows once it is dark.

What are the most common mistakes when ordering a sign?

The most common mistake is guessing the measurements from a photograph. The second is starting the job without the vector file of the logo. The third is leaving the lighting decision to the end, because hanging a lit sign on a facade where no power line was planned leaves the cable in view.

Another mistake is choosing the same colour as the neighbouring sign. Two signs of the same colour side by side on a street cancel each other out. That is why looking at the neighbouring facades during the survey matters as much as taking measurements.

The last mistake is comparing price on its own. Two quotes cannot be compared unless they cover the same size, the same material, the same light source and the same installation scope. If the cheaper quote leaves out installation or uses a shorter lived lighting part, the difference is paid later.

Does a sign need maintenance after handover?

It does, but not much. On a lit sign the light source or the driver may need replacing over time. That is why the handover should include, in writing, which part is replaced how and whom to contact. Every surface on an exterior facade gathers dust and soot, and a gentle clean once a year keeps it readable.

A sign stays on the facade for the life of the business and is usually the most seen piece of the brand. Running the job in the right order is what secures that long life. First the photographs and the file, then the measurements, then design approval, then the permit, and production and installation last. When the order breaks, the cost shows on the facade.

Is the sign survey charged for?

In Kemalpasa and the surrounding area the survey for signage and vehicle work is free of charge. At the survey the facade is measured, the power line and the mounting surface are settled and the neighbouring signs are noted. The quote is written on top of those measurements, not as a figure given from a photograph.

Who pays the advertising tax, and when is it declared?

The tax belongs to the business, and the declaration is filed with the municipality before the sign goes up. The amount is calculated from the municipality’s own tariff according to the square metres of the sign and whether it is lit. The sign maker provides the size and the type in writing, the business files the declaration.

What does it take for a sign to be readable at night as well?

The light source is chosen at the design stage and the power line is planned at the survey. An internally lit letter reads by itself at night, while backlighting shows the letter through the light it throws on the wall. Both do more work than daylight for a business open in the evening. An unlit sign is left to the street lighting at night.